About the project
Additions & Alteration works to 2 blocks of existing 4 storey research centre with basement carpark:
- Phase 1A (Aries): Relocated entrance at basement carpark with demolition, excavation, RC substructure and superstructure, wall and floor finishes, painting, M&E works, cleaning, and handover.
- Phase 1 (Aries): New amenities facing Science Park Road including piling, excavation, RC works, steel structures, curtain wall system, glass canopy, aluminium roof/cladding, wall, ceiling and floor finishes, waterproofing, railings, painting, landscaping, and M&E installations.
- Phase 1 (Gemini): New amenities with similar scope covering demolition, piling, RC and steel structures, curtain wall, aluminium roof/cladding, finishes, waterproofing, railings, painting, landscaping, and M&E works including platform lift.
- Phase 2 (Aries): New amenities facing inner road and drop-off point with demolition, piling, excavation, RC and steel structures, aluminium roof, interphasing works, reinstatement of landscaping, painting, and M&E works.
- Phase 3: Covered linkway between bus stops including demolition, piling, excavation, RC and steel structures, aluminium roof, landscaping reinstatement, painting, and M&E works.