About the project
Addition & Alteration works to Multi Purpose Sports Hall:
- Installation of new Porter Fire-Safe Wall Padding to enhance impact protection and fire safety compliance.
- Installation of new Aacer Flex Timber Flooring complete with all necessary accessories and finishes with the MPH.
- Construction and upgrading of the External Façade, including all associated architectural finishes.
- Construction of a new AHU Area, inclusive of a complete waterproofing system to ensure long-term weather protection.
- Installation of a new AV System, incorporating acoustic wall panels to achieve the required sound performance and aesthetics.
- Installation of a new USG Boral Aluminium Baffle Ceiling complete with suspension systems and associated ceiling accessories.
- Supply, installation, testing and commissioning of a new electrically operated Schelde Basketball Backstop System, including all supporting structural members, electrical connections, controls, and safety features.